Eye On The Future - Metropolitan Transportation Authority (MTA) Contract Solicitations

Dataset

Name Value
Catalog Link
Metadata Link
Data: JSON 100 Rows
Data: CSV 100 Rows
Host data.ny.gov
Id e3e7-qwer
Name Eye On The Future - Metropolitan Transportation Authority (MTA) Contract Solicitations
Attribution MTA New York City Transit; MTA Long Island Rail Road; MTA Metro-North Railroad; MTA Bridges & Tunnels; MTA Capital Construction Company; MTA Bus Company.
Category Transportation
Tags capital projects, bridges, tunnels, railroads
Created 2013-05-07T14:44:42Z
Publication Date 2016-10-18T22:02:34Z

Description

The Eye On The Future data contains information for prospective contractors, engineers, architects and vendors about contacts that are expected to be advertised for bids during specific time period by the Metropolitan Transportation Authority’s(MTA) operating agencies.

Columns

| Included | Schema Type    | Field Name           | Name                 | Data Type | Render Type |
| ======== | ============== | ==================== | ==================== | ========= | =========== |
| Yes      | series tag     | reference_number     | Reference Number     | text      | text        |
| Yes      | series tag     | agency               | Agency               | text      | text        |
| Yes      | series tag     | agency_description   | Agency Description   | text      | text        |
| Yes      | series tag     | type_of_contract     | Type of Contract     | text      | text        |
| Yes      | numeric metric | duration_of_contract | Duration of Contract | number    | number      |
| Yes      | series tag     | contract_description | Contract Description | text      | text        |
| Yes      | series tag     | project_description  | Project Description  | text      | text        |
| Yes      | series tag     | solicitation_month   | Solicitation Month   | text      | text        |
| Yes      | time           | solicitation_year    | Solicitation Year    | number    | number      |
| Yes      | series tag     | dollar_range         | Dollar Range         | text      | text        |
| Yes      | series tag     | task_1               | Task 1               | text      | text        |
| Yes      | series tag     | task_2               | Task 2               | text      | text        |
| Yes      | series tag     | task_3               | Task 3               | text      | text        |
| Yes      | series tag     | task_4               | Task 4               | text      | text        |
| Yes      | series tag     | task_5               | Task 5               | text      | text        |
| Yes      | series tag     | task_6               | Task 6               | text      | text        |
| Yes      | series tag     | task_7               | Task 7               | text      | text        |
| Yes      | series tag     | task_8               | Task 8               | text      | text        |
| Yes      | series tag     | task_9               | Task 9               | text      | text        |
| Yes      | series tag     | task_10              | Task 10              | text      | text        |
| Yes      | series tag     | task_11              | Task 11              | text      | text        |
| Yes      | series tag     | task_12              | Task 12              | text      | text        |
| Yes      | series tag     | task_13              | Task 13              | text      | text        |
| Yes      | series tag     | task_14              | Task 14              | text      | text        |

Time Field

Value = solicitation_year
Format & Zone = yyyy

Data Commands

series e:e3e7-qwer d:2016-01-01T00:00:00.000Z t:reference_number=HH-13A/HH-88B t:type_of_contract=Constr t:contract_description="Reconstruction of Toll Plazas and Southbound Approach at Henry Hudson Bridge, and Replacement of Facility Lighting System" t:solicitation_month=SEP t:task_1="Complete replacement of the bridge deck, superstructure, and substructure elements of the Upper and Lower Level Toll Plazas." t:agency_description="Bridges and Tunnels" t:task_5="Construction of new utility services for the Lower Level Maintenance Garage, including heating, cooling, plumbing, water services, and bay doors." t:task_4="Replacement of retaining walls at and around the toll plazas." t:agency=B&T t:task_3="Reframing lower level plaza to eliminate the columns that currently support the upper level plaza deck and structure." t:task_2="Full replacement of the south approach structure including the maintenance garage." t:project_description="Under this construction contract, the contractor will reconstruct the upper and lower level of toll plaza areas including full replacement of the south approach structure. Project also includes replacement of facility lighting system and other miscellaneous construction work. Scope of Work includes but is not Limited to:" t:dollar_range="OVER $50M" t:task_6="Replacement of all existing guiderail, aluminum light poles with wooden light poles and LED fixtures on the Henry Hudson Parkway (northbound and southbound)." m:duration_of_contract=45

series e:e3e7-qwer d:2016-01-01T00:00:00.000Z t:reference_number=RK-07 t:type_of_contract=Constr t:contract_description="Design-Build Mechanical/Electrical Rehabilitation of Harlem River Lift Span" t:solicitation_month=SEP t:task_1="Verify the existing mechanical and electrical conditions at the Harlem River Lift Span and the available documentation as described in the RFP." t:agency_description="Bridges and Tunnels" t:task_5="Conduct mechanical and electrical systems testing, as well as, train the Authority personnel on such systems." t:task_4="Comply with all design criteria, phasing approach, environmental permits and approvals, schedule, fire and security requirements." t:agency=B&T t:task_3="Design and install the upgrading and repair of electrical and mechanical equipment including: new generator & ATS switch located on land, including provisions for access road, and miscellaneous structural components such as; adjustment of live load bearing lift span balancing, pier navigation, tower service lights, aviation and navigation lights, droop cable replacement." t:task_2="Design and install all new electrical and mechanical upgrades and replacements with additional capability to accommodate future use." t:project_description="This Design-Build contract will include repair/replacement of certain mechanical components of the PLC system.  In addition, electrical components of the lift span will be replaced, to include the 5kV switch gear, the droop cable, and installation of a dehumidification system in both machinery rooms.  Scope of Work includes but is not limited to:" t:dollar_range="$10M - $50M" m:duration_of_contract=36

series e:e3e7-qwer d:2016-01-01T00:00:00.000Z t:reference_number="RK-19/RK-70/RK-70 Paint" t:type_of_contract="Special Services" t:contract_description="Conceptual Design for Seismic & Wind Retrofit of the Suspended Span and Miscellaneous Structural Rehabilitation and Painting of Suspended Span of RFK Bridge" t:solicitation_month=SEP t:agency_description="Bridges and Tunnels" t:agency=B&T t:project_description="Under this contract, the consultant will perform a feasibility study on the following: Installation of a traveler system on the suspended spans; Widening the suspended span sidewalk; and Reducing transverse roadway joints on the suspended span orthotropic deck.  Based on the results of this feasibility study, as well as the results of the original RK 19 study, the Consultant shall prepare a conceptual design.  The Scope of work for the Conceptual Design includes but is not limited to:  All seismic and wind retrofits necessary on the suspended span including widening of the sidewalk;  Replacement of the median and side barriers including any necessary additional wind testing the barrier crash testing; Retrofits on the stringer to floor beam connections of the suspended spans; Retrofits to the joint system; Miscellaneous structural repairs to address biennial flags for all three legs of RFK Bridge, and Spot cleaning and painting of the suspended span steel. Upon acceptance of the Conceptual Design, additional design phases may be awarded." t:dollar_range="$5M - $10M" m:duration_of_contract=27

Meta Commands

metric m:duration_of_contract p:integer l:"Duration of Contract" d:"Duration in months" t:dataTypeName=number

entity e:e3e7-qwer l:"Eye On The Future - Metropolitan Transportation Authority (MTA) Contract Solicitations" t:attribution="MTA New York City Transit; MTA Long Island Rail Road; MTA Metro-North Railroad; MTA Bridges & Tunnels; MTA Capital Construction Company; MTA Bus Company." t:url=https://data.ny.gov/api/views/e3e7-qwer

property e:e3e7-qwer t:meta.view v:id=e3e7-qwer v:category=Transportation v:attributionLink=http://www.mta.info/mta/capital/eotf-allagency_new.htm v:averageRating=0 v:name="Eye On The Future - Metropolitan Transportation Authority (MTA) Contract Solicitations" v:attribution="MTA New York City Transit; MTA Long Island Rail Road; MTA Metro-North Railroad; MTA Bridges & Tunnels; MTA Capital Construction Company; MTA Bus Company."

property e:e3e7-qwer t:meta.view.owner v:id=xzik-pf59 v:profileImageUrlMedium=/api/users/xzik-pf59/profile_images/THUMB v:profileImageUrlLarge=/api/users/xzik-pf59/profile_images/LARGE v:screenName="NY Open Data" v:profileImageUrlSmall=/api/users/xzik-pf59/profile_images/TINY v:displayName="NY Open Data"

property e:e3e7-qwer t:meta.view.tableauthor v:id=xzik-pf59 v:profileImageUrlMedium=/api/users/xzik-pf59/profile_images/THUMB v:profileImageUrlLarge=/api/users/xzik-pf59/profile_images/LARGE v:screenName="NY Open Data" v:profileImageUrlSmall=/api/users/xzik-pf59/profile_images/TINY v:roleName=publisher v:displayName="NY Open Data"

Top Records

| reference_number        | agency | agency_description   | type_of_contract | duration_of_contract | contract_description                                                                                                                                         | project_description                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      | solicitation_month | solicitation_year | dollar_range | task_1                                                                                                                                                                                                                                                       | task_2                                                                                                                                                                | task_3                                                                                                                                                                                                                                                                                                                                                                                | task_4                                                                                                                            | task_5                                                                                                                                            | task_6                                                                                                                                                        | task_7 | task_8 | task_9 | task_10 | task_11 | task_12 | task_13 | task_14 | 
| ======================= | ====== | ==================== | ================ | ==================== | ============================================================================================================================================================ | ======================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================================== | ================== | ================= | ============ | ============================================================================================================================================================================================================================================================ | ===================================================================================================================================================================== | ===================================================================================================================================================================================================================================================================================================================================================================================== | ================================================================================================================================= | ================================================================================================================================================= | ============================================================================================================================================================= | ====== | ====== | ====== | ======= | ======= | ======= | ======= | ======= | 
| HH-13A/HH-88B           | B&T    | Bridges and Tunnels  | Constr           | 45                   | Reconstruction of Toll Plazas and Southbound Approach at Henry Hudson Bridge, and Replacement of Facility Lighting System                                    | Under this construction contract, the contractor will reconstruct the upper and lower level of toll plaza areas including full replacement of the south approach structure. Project also includes replacement of facility lighting system and other miscellaneous construction work. Scope of Work includes but is not Limited to:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       | SEP                | 2016              | OVER $50M    | Complete replacement of the bridge deck, superstructure, and substructure elements of the Upper and Lower Level Toll Plazas.                                                                                                                                 | Full replacement of the south approach structure including the maintenance garage.                                                                                    | Reframing lower level plaza to eliminate the columns that currently support the upper level plaza deck and structure.                                                                                                                                                                                                                                                                 | Replacement of retaining walls at and around the toll plazas.                                                                     | Construction of new utility services for the Lower Level Maintenance Garage, including heating, cooling, plumbing, water services, and bay doors. | Replacement of all existing guiderail, aluminum light poles with wooden light poles and LED fixtures on the Henry Hudson Parkway (northbound and southbound). |        |        |        |         |         |         |         |         | 
| RK-07                   | B&T    | Bridges and Tunnels  | Constr           | 36                   | Design-Build Mechanical/Electrical Rehabilitation of Harlem River Lift Span                                                                                  | This Design-Build contract will include repair/replacement of certain mechanical components of the PLC system. In addition, electrical components of the lift span will be replaced, to include the 5kV switch gear, the droop cable, and installation of a dehumidification system in both machinery rooms. Scope of Work includes but is not limited to:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               | SEP                | 2016              | $10M - $50M  | Verify the existing mechanical and electrical conditions at the Harlem River Lift Span and the available documentation as described in the RFP.                                                                                                              | Design and install all new electrical and mechanical upgrades and replacements with additional capability to accommodate future use.                                  | Design and install the upgrading and repair of electrical and mechanical equipment including: new generator & ATS switch located on land, including provisions for access road, and miscellaneous structural components such as; adjustment of live load bearing lift span balancing, pier navigation, tower service lights, aviation and navigation lights, droop cable replacement. | Comply with all design criteria, phasing approach, environmental permits and approvals, schedule, fire and security requirements. | Conduct mechanical and electrical systems testing, as well as, train the Authority personnel on such systems.                                     |                                                                                                                                                               |        |        |        |         |         |         |         |         | 
| RK-19/RK-70/RK-70 Paint | B&T    | Bridges and Tunnels  | Special Services | 27                   | Conceptual Design for Seismic & Wind Retrofit of the Suspended Span and Miscellaneous Structural Rehabilitation and Painting of Suspended Span of RFK Bridge | Under this contract, the consultant will perform a feasibility study on the following: Installation of a traveler system on the suspended spans; Widening the suspended span sidewalk; and Reducing transverse roadway joints on the suspended span orthotropic deck. Based on the results of this feasibility study, as well as the results of the original RK 19 study, the Consultant shall prepare a conceptual design. The Scope of work for the Conceptual Design includes but is not limited to: All seismic and wind retrofits necessary on the suspended span including widening of the sidewalk; Replacement of the median and side barriers including any necessary additional wind testing the barrier crash testing; Retrofits on the stringer to floor beam connections of the suspended spans; Retrofits to the joint system; Miscellaneous structural repairs to address biennial flags for all three legs of RFK Bridge, and Spot cleaning and painting of the suspended span steel. Upon acceptance of the Conceptual Design, additional design phases may be awarded. | SEP                | 2016              | $5M - $10M   |                                                                                                                                                                                                                                                              |                                                                                                                                                                       |                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                                                   |                                                                                                                                                   |                                                                                                                                                               |        |        |        |         |         |         |         |         | 
| RK-20                   | B&T    | Bridges and Tunnels  | Special Services | 72                   | Design for Main Cable Inspection and Rehabilitation                                                                                                          | Under this contract the consultant will prepare design for the East River Suspension Spans of RFK Bridge main cable inspection and required restoration work. Consultant shall also perform the inspection of the cable panels that are un-wrapped, as well as model the remaining cable strength based upon wire testing data. Scope of Work includes but is not limited to:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            | SEP                | 2016              | $1M - $5M    | Review available documentation and inspection reports related to the project scope.                                                                                                                                                                          | Prepare inspection protocol and staging plan for suspension span main cable. Provide design for cable un-wrapping, wedging, sampling, and re-wrapping.                | Perform inspection of the unwrapped cable panels and perform cable strength modeling based on wire testing data.                                                                                                                                                                                                                                                                      |                                                                                                                                   |                                                                                                                                                   |                                                                                                                                                               |        |        |        |         |         |         |         |         | 
| TN-55                   | B&T    | Bridges and Tunnels  | Special Services | 24                   | Scoping for Replacement of Bronx and Queens Approach Viaducts and Lower Garage at the Throgs Neck Bridge                                                     | Under this contract the consultant will perform an engineering study to address current and anticipated deterioration as well as service-related issues, including increased traffic demand and existing non-conforming and obsolete elements. Additionally, alternatives for rehabilitation or replacement of the approaches to bring them up to current seismic loading, and geometric criteria will be investigated. Partial and full replacement alternatives shall address the following: constructability, service life, ease of maintenance, utilities (including new utilities, continuation of service during construction, and access to utilities during and after construction), and environmental and other permitting. Scope of Work includes but is not limited to:                                                                                                                                                                                                                                                                                                       | SEP                | 2016              | $5M - $10M   | Investigation and evaluation of superstructure elements, substructure elements, and seismic vulnerability with consideration of rehabilitation measures to be performed under Project TN-53.                                                                 | Geotechnical investigation, to include approximately 30 borings.                                                                                                      | Hazardous materials assessment.                                                                                                                                                                                                                                                                                                                                                       | Evaluation of three (3) alternatives for partial or full approach viaduct replacement in the Design Brief (10% Completion).       |                                                                                                                                                   |                                                                                                                                                               |        |        |        |         |         |         |         |         | 
| HC-80/QM-36             | B&T    | Bridges and Tunnels  | Special Services | 18                   | Design for Rehab of HLCT and QMT Ventilation Buildings                                                                                                       | Under this contract, the consultant will prepare a design for the rehabilitation of the Ventilation Buildings at both the Hugh Lincoln Carey Tunnel and the Queens Midtown Tunnel to address all deficiencies including architectural, structural, safety, and mechanical issues.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        | NOV                | 2016              | $5M - $10M   |                                                                                                                                                                                                                                                              |                                                                                                                                                                       |                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                                                   |                                                                                                                                                   |                                                                                                                                                               |        |        |        |         |         |         |         |         | 
| M10353                  | MNR    | Metro North Railroad | Purchase         | 11                   | Purchase eight (8) Backhoe w/Trailer                                                                                                                         | This contract will provide for the purchase of eight (8) backhoes with trailers for Metro-North Railroad?s Maintenance of Way Track and Structures Department. Required modifications to include snow plow, various sized buckets, hi-rail equipment and other work implements.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          | OCT                | 2016              | $1M - $5M    | - Fabrication of eight (8) backhoes                                                                                                                                                                                                                          | - Procurement of eight (8) trailers                                                                                                                                   | - Procurement of snow plow                                                                                                                                                                                                                                                                                                                                                            | - Procurement of various sized buckets                                                                                            | - Procurement of hi-rail equipment                                                                                                                | - Procurement of other work implements (tamp ties, tie grapple, high flow tool circuits, ballast boom attachment)                                             |        |        |        |         |         |         |         |         | 
| VN-34                   | B&T    | Bridges and Tunnels  | Constr           | 39                   | Design-Build: Main Cable Inspection and Suspender Rope Testing at VNB Bridge                                                                                 | The purpose of this Design-Build Contract is to remove suspender ropes for testing and open several main cable panels for inspection and testing. The Scope of work for this Contract includes but is not limited to:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    | JAN                | 2017              | $10M - $50M  | Prepare design for unwrapping, wedging, wire sampling, compaction and re-wrapping of main cables at selected panel locations including traffic maintenance and protection, access platform design in accordance with design build criteria set forth in RFP. | Perform main cable unwrapping, wire sampling as directed by the cable modeling consultant, cable compaction and re-wrapping on all four cables at selected locations. | Prepare design for removal, replacement and designated testing of suspender ropes including traffic maintenance and protection, access platform design, temporary supports and jacking requirements.                                                                                                                                                                                  | Perform suspender rope removal and replacement at selected locations.                                                             | Perform testing of suspender rope samples and main cable wires.                                                                                   |                                                                                                                                                               |        |        |        |         |         |         |         |         | 
| RK-58                   | B&T    | Bridges and Tunnels  | Special Services | 18                   | Design for Rehabilitation of Robert Moses Building and Service Buildings of RFK Facility                                                                     | Under this contract, the consultant shall prepare design for the renovation of three buildings on the Randall?s Island campus of the RFK Bridge. These buildings include the Robert Moses Building, the Manhattan Service Building and the Bronx Service Building. Design work will include rehabilitation of interior spaces, including finishes and MEP systems, as well as the exterior envelope.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     | MAR                | 2017              | $1M - $5M    |                                                                                                                                                                                                                                                              |                                                                                                                                                                       |                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                                                   |                                                                                                                                                   |                                                                                                                                                               |        |        |        |         |         |         |         |         | 
| VN-86                   | B&T    | Bridges and Tunnels  | Special Services | 36                   | Design for widening of Belt Parkway                                                                                                                          | Under this contract, the consultant will prepare design for the construction of an additional eastbound lane on the Belt Parkway from the VNB to Bay Parkway. This design shall include necessary roadway grading, alignment, construction details, drainage, MPT, and electrical work. Consultant shall assist B&T with permitting and inter-agency coordination.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       | MAR                | 2017              | $1M - $5M    |                                                                                                                                                                                                                                                              |                                                                                                                                                                       |                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                                                   |                                                                                                                                                   |                                                                                                                                                               |        |        |        |         |         |         |         |         |